<?xml version="1.0" encoding="UTF-8"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-10-18T23:47:43Z</responseDate><request verb="GetRecord" identifier="oai:ebyu-rdlopen.rawdatalibrary.net:ebyu/10172" metadataPrefix="oai_dc">https://ebyu-rdlopen.rawdatalibrary.net/oai/request</request><GetRecord><record><header><identifier>oai:ebyu-rdlopen.rawdatalibrary.net:ebyu/10172</identifier><datestamp>2026-10-18T20:25:25Z</datestamp><setSpec>openaire</setSpec><setSpec>driver</setSpec><setSpec>com_ebyu_10000</setSpec><setSpec>col_ebyu_10001</setSpec></header><metadata><oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><dc:title>Application of Arithmetic Optimization Algorithm (AOA) for Time–Cost–Quality–Environmental Impact Optimization in Construction Projects</dc:title><dc:creator>Yılmaz, Mehmet</dc:creator><dc:creator>Dede, Tayfun</dc:creator><dc:creator>Rao, Ravipudi Venkata</dc:creator><dc:contributor>R.V., Rao</dc:contributor><dc:contributor>J., Taler</dc:contributor><dc:contributor>D., Taler</dc:contributor><dc:subject>Arithmetic optimization algorithm</dc:subject><dc:subject>Many-objective optimization</dc:subject><dc:subject>Time–cost–quality–environmental impact trade-off</dc:subject><dc:subject>Costs</dc:subject><dc:subject>Environmental impact</dc:subject><dc:subject>Function evaluation</dc:subject><dc:subject>Project management</dc:subject><dc:subject>Quality control</dc:subject><dc:subject>Sustainable development</dc:subject><dc:subject>Adaptive selection</dc:subject><dc:subject>Construction projects</dc:subject><dc:subject>Many-objective optimizations</dc:subject><dc:subject>Optimization algorithms</dc:subject><dc:subject>Performance</dc:subject><dc:subject>Slime moulds</dc:subject><dc:subject>Time cost</dc:subject><dc:subject>Trade off</dc:subject><dc:subject>Economic and social effects</dc:subject><dc:description>This study aims to investigate the relationship between time, cost, quality, and environmental impact in construction projects using arithmetic optimization algorithm. Project managers have prioritized time and cost concepts in traditional project planning. It is seen that other factors affecting the success of the project are ignored. However, with the impact of technological and sociocultural changes, awareness of sustainability and environmental factors has increased. For this reason, there are studies showing that environmental impact is taken into account at least as much as time, cost, and quality in project management. Therefore, this study evaluates the performance of the arithmetic optimization algorithm (AOA) on the many-objective time–cost–quality–environmental impact problem. The performance of the AOA was compared with the adaptive selection slime mold algorithm (ASSMA), which is known to give good results in the literature. The results show that the AOA outperforms the ASSMA in terms of cost, environmental impact, and quality with 25% less function evaluation. © The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd. 2026.</dc:description><dc:publisher>Springer Science and Business Media Deutschland GmbH</dc:publisher><dc:date>2026</dc:date><dc:type>Conference Object</dc:type><dc:identifier>https://rdlopen.rawdatalibrary.net/r/ebyu/10172</dc:identifier><dc:identifier>https://doi.org/10.1007/978-981-96-8070-2_27</dc:identifier><dc:identifier>978-981968069-6</dc:identifier><dc:identifier>1876-1100</dc:identifier><dc:language>en</dc:language><dc:relation>Lecture Notes in Electrical Engineering</dc:relation><dc:rights>info:eu-repo/semantics/openAccess</dc:rights><dc:type>info:eu-repo/semantics/conferenceObject</dc:type><dc:identifier>https://ebyu-rdlopen.rawdatalibrary.net/tr/items/ebyu/10172</dc:identifier></oai_dc:dc></metadata></record></GetRecord></OAI-PMH>