Multi-objective time-cost-safety risk trade-off optimization for the construction scheduling problem

ArticleAçık Erişim

Özet

Purpose – The purpose of this study is to enable the planning of construction projects with simultaneous consideration of time, cost and safety risks. It also aims to improve the decision-making process by evaluating the effectiveness of the Rao-2 algorithm in solving multi-objective time-cost-safety risk problems. In the end, this model is designed to support project managers in enhancing management approaches by addressing project challenges and constraints more efficiently. Design/methodology/approach – In this study, the Rao-2 algorithm, along with Grey Wolf Optimization (GWO) and Whale Optimization algorithm (WOA), were improved using the crowding distance-based non-dominated sorting method. Rao-2 was first compared to GWO and WOA. Subsequently, it was compared with well-established algorithms in the literature, including genetic algorithm (GA), particle swarm optimization (PSO) and differential evolution (DE). The C-metric, hypervolume and spread metrics were employed for performance measurement. The performance of the algorithms was evaluated on four case studies consisting of 11, 13, 18 and 25 activities. Findings – The results revealed that Rao-2 performs better than other algorithms as the number of activities increases, when compared using the Hypervolume, Spread and C-metric measures. In terms of performance measures, the GWO algorithm outperformed Rao-2 in some evaluation metrics for the instance involving 11 activities. However, as the number of activities grew, the Rao-2 method consistently generated higher-quality Pareto fronts and outperformed GWO and WOA in all evaluation metrics. The solutions generated by Rao-2 were also superior to those obtained from GA, PSO and DE in all case studies, further demonstrating the capability of our framework to produce a wide range of optimal solutions with high diversity across different case studies. Originality/value – This research demonstrates that Rao-2 not only improves solution quality when generating Pareto fronts but also achieves better results with fewer function evaluations compared to GA, PSO and DE. The algorithm's efficiency makes it particularly well-suited for optimizing time, cost and safety risks in large-scale construction projects, which in turn positions Rao-2 as a better choice for such projects by producing superior results compared to other algorithms. By providing high-quality solutions with reduced computational demands, Rao-2 offers a faster and more resource-efficient tool for decision-making, contributing to advancements in both the theory and practice of construction project management. © 2024 Emerald Publishing Limited

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/ebyu/10334Resmi atıflarda kullanılan kalıcı adres
DOI
https://doi.org/10.1108/ecam-02-2024-0249Yayıncı resmi DOI adresi
Tam Kayıt
AlanDeğerDil
dc.contributor.authorYılmaz, Mehmet
dc.contributor.authorDede, Tayfun
dc.date.accessioned2026-10-18T20:25:34.070288360Z
dc.date.available2026-10-18T20:25:34.070288360Z
dc.date.issued2026
dc.description.abstractPurpose – The purpose of this study is to enable the planning of construction projects with simultaneous consideration of time, cost and safety risks. It also aims to improve the decision-making process by evaluating the effectiveness of the Rao-2 algorithm in solving multi-objective time-cost-safety risk problems. In the end, this model is designed to support project managers in enhancing management approaches by addressing project challenges and constraints more efficiently. Design/methodology/approach – In this study, the Rao-2 algorithm, along with Grey Wolf Optimization (GWO) and Whale Optimization algorithm (WOA), were improved using the crowding distance-based non-dominated sorting method. Rao-2 was first compared to GWO and WOA. Subsequently, it was compared with well-established algorithms in the literature, including genetic algorithm (GA), particle swarm optimization (PSO) and differential evolution (DE). The C-metric, hypervolume and spread metrics were employed for performance measurement. The performance of the algorithms was evaluated on four case studies consisting of 11, 13, 18 and 25 activities. Findings – The results revealed that Rao-2 performs better than other algorithms as the number of activities increases, when compared using the Hypervolume, Spread and C-metric measures. In terms of performance measures, the GWO algorithm outperformed Rao-2 in some evaluation metrics for the instance involving 11 activities. However, as the number of activities grew, the Rao-2 method consistently generated higher-quality Pareto fronts and outperformed GWO and WOA in all evaluation metrics. The solutions generated by Rao-2 were also superior to those obtained from GA, PSO and DE in all case studies, further demonstrating the capability of our framework to produce a wide range of optimal solutions with high diversity across different case studies. Originality/value – This research demonstrates that Rao-2 not only improves solution quality when generating Pareto fronts but also achieves better results with fewer function evaluations compared to GA, PSO and DE. The algorithm's efficiency makes it particularly well-suited for optimizing time, cost and safety risks in large-scale construction projects, which in turn positions Rao-2 as a better choice for such projects by producing superior results compared to other algorithms. By providing high-quality solutions with reduced computational demands, Rao-2 offers a faster and more resource-efficient tool for decision-making, contributing to advancements in both the theory and practice of construction project management. © 2024 Emerald Publishing Limited
dc.identifier.doi10.1108/ecam-02-2024-0249
dc.identifier.eissn1365-232X
dc.identifier.endpage412
dc.identifier.issn0969-9988
dc.identifier.issue1
dc.identifier.scopus2-s2.0-85208643877
dc.identifier.startpage380
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/ebyu/10334
dc.identifier.volume33
dc.identifier.wosWOS:001351015600001
dc.language.isoen
dc.publisherEmerald Publishing
dc.relation.ispartofEngineering, Construction and Architectural Management
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectGWO
dc.subjectRao-2
dc.subjectTime-cost-safety tradeoff
dc.subjectWOA
dc.subjectCosts
dc.subjectCritical path analysis
dc.subjectMultiobjective optimization
dc.subjectPareto principle
dc.subjectParticle swarm optimization (PSO)
dc.subjectProject management
dc.subjectRisk assessment
dc.subjectRisk management
dc.subjectGray wolf optimization
dc.subjectGray wolves
dc.subjectOptimisations
dc.subjectOptimization algorithms
dc.subjectParticle swarm
dc.subjectSafety risks
dc.subjectTime cost
dc.subjectWhale optimization algorithm
dc.subjectDecision making
dc.titleMulti-objective time-cost-safety risk trade-off optimization for the construction scheduling problem
dc.typeArticle
dspace.entity.typePublication
rdl.citation.scopus8
rdl.citation.wos10
rdl.source.indexSCOPUS
rdl.source.indexWOS
rdl.wos.indexScience Citation Index Expanded (SCI-EXPANDED)
rdl.wos.indexSocial Science Citation Index (SSCI)