Integrated risk management in construction project: utilizing NDSII-BMR and NDSII-BWR for time-cost-safety trade-offs

ArticleAçık Erişim

Özet

Purpose – This research introduces novel algorithms (NDS-II-BMR and NDS-II-BWR) that combine the simplicity of best-mean-random (BMR) and best-worst-random (BWR) approaches with the opting mechanisms of NDS-II. Design/methodology/approach – This study expands on earlier comparison assessments by adding a broader range of algorithms, including MOPSO, NSGAII, PESA2 and WOA, to provide a more comprehensive evaluation approach for the proposed NDSII-BMR and NDSII-BWR algorithms. In addition to typical performance measurements, this study utilizes sophisticated statistical validation through the Wilcoxon signed-rank test to determine the statistical significance of performance differences across this varied range of multi-objective optimization approaches. Findings – The results demonstrate the effectiveness of NDSII-BMR and NDSII-BWR in optimizing costs and decreasing safety risks while minimizing time efficiency. These outcomes underscore the applicability of these models for managing complex construction projects in real-world scenarios. Originality/value – This study employs multi-objective functions to minimize the total project time and cost while reducing overall safety risks. The proposed model integrates the NDS-II framework with innovative strategies, best-mean-random (BMR) and best-worst-random (BWR). © 2025 Emerald Publishing Limited

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/ebyu/11351Resmi atıflarda kullanılan kalıcı adres
DOI
https://doi.org/10.1108/ec-04-2025-0339Yayıncı resmi DOI adresi
Tam Kayıt
AlanDeğerDil
dc.contributor.authorDede, Tayfun
dc.contributor.authorSin, Theint Shwe
dc.contributor.authorYılmaz, Mehmet
dc.contributor.authorUçan, Hacı Abdullah
dc.contributor.authorRao, Ravipudi Venkata
dc.date.accessioned2026-10-18T20:26:24.998830993Z
dc.date.available2026-10-18T20:26:24.998830993Z
dc.date.issued2025
dc.description.abstractPurpose – This research introduces novel algorithms (NDS-II-BMR and NDS-II-BWR) that combine the simplicity of best-mean-random (BMR) and best-worst-random (BWR) approaches with the opting mechanisms of NDS-II. Design/methodology/approach – This study expands on earlier comparison assessments by adding a broader range of algorithms, including MOPSO, NSGAII, PESA2 and WOA, to provide a more comprehensive evaluation approach for the proposed NDSII-BMR and NDSII-BWR algorithms. In addition to typical performance measurements, this study utilizes sophisticated statistical validation through the Wilcoxon signed-rank test to determine the statistical significance of performance differences across this varied range of multi-objective optimization approaches. Findings – The results demonstrate the effectiveness of NDSII-BMR and NDSII-BWR in optimizing costs and decreasing safety risks while minimizing time efficiency. These outcomes underscore the applicability of these models for managing complex construction projects in real-world scenarios. Originality/value – This study employs multi-objective functions to minimize the total project time and cost while reducing overall safety risks. The proposed model integrates the NDS-II framework with innovative strategies, best-mean-random (BMR) and best-worst-random (BWR). © 2025 Emerald Publishing Limited
dc.identifier.doi10.1108/ec-04-2025-0339
dc.identifier.eissn1758-7077
dc.identifier.endpage34
dc.identifier.issn0264-4401
dc.identifier.issue1
dc.identifier.scopus2-s2.0-105022738679
dc.identifier.startpage1
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/ebyu/11351
dc.identifier.volume43
dc.identifier.wosWOS:001614715700001
dc.language.isoen
dc.publisherEmerald Publishing
dc.relation.ispartofEngineering Computations (Swansea, Wales)
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectBMR
dc.subjectBWR
dc.subjectConstruction project management
dc.subjectCost
dc.subjectNDS-II
dc.subjectOptimization
dc.subjectSafety risk
dc.subjectTime
dc.subjectTrade-off
dc.subjectMultiobjective optimization
dc.subjectProject management
dc.subjectRisk management
dc.subjectSafety engineering
dc.subjectBest-bad-random
dc.subjectBest-mean-random
dc.subjectConstruction projects
dc.subjectIntegrated risk management
dc.subjectOptimisations
dc.subjectSafety risks
dc.subjectTrade off
dc.subjectCosts
dc.subjectEconomic and social effects
dc.titleIntegrated risk management in construction project: utilizing NDSII-BMR and NDSII-BWR for time-cost-safety trade-offs
dc.typeArticle
dspace.entity.typePublication
rdl.citation.scopus5
rdl.citation.wos4
rdl.source.indexSCOPUS
rdl.source.indexWOS
rdl.wos.indexScience Citation Index Expanded (SCI-EXPANDED)