Integrated risk management in construction project: utilizing NDSII-BMR and NDSII-BWR for time-cost-safety trade-offs
Özet
Purpose – This research introduces novel algorithms (NDS-II-BMR and NDS-II-BWR) that combine the simplicity of best-mean-random (BMR) and best-worst-random (BWR) approaches with the opting mechanisms of NDS-II. Design/methodology/approach – This study expands on earlier comparison assessments by adding a broader range of algorithms, including MOPSO, NSGAII, PESA2 and WOA, to provide a more comprehensive evaluation approach for the proposed NDSII-BMR and NDSII-BWR algorithms. In addition to typical performance measurements, this study utilizes sophisticated statistical validation through the Wilcoxon signed-rank test to determine the statistical significance of performance differences across this varied range of multi-objective optimization approaches. Findings – The results demonstrate the effectiveness of NDSII-BMR and NDSII-BWR in optimizing costs and decreasing safety risks while minimizing time efficiency. These outcomes underscore the applicability of these models for managing complex construction projects in real-world scenarios. Originality/value – This study employs multi-objective functions to minimize the total project time and cost while reducing overall safety risks. The proposed model integrates the NDS-II framework with innovative strategies, best-mean-random (BMR) and best-worst-random (BWR). © 2025 Emerald Publishing Limited
Anahtar Kelimeler
Tam Kayıt
| Alan | Değer | Dil |
|---|---|---|
| dc.contributor.author | Dede, Tayfun | |
| dc.contributor.author | Sin, Theint Shwe | |
| dc.contributor.author | Yılmaz, Mehmet | |
| dc.contributor.author | Uçan, Hacı Abdullah | |
| dc.contributor.author | Rao, Ravipudi Venkata | |
| dc.date.accessioned | 2026-10-18T20:26:24.998830993Z | |
| dc.date.available | 2026-10-18T20:26:24.998830993Z | |
| dc.date.issued | 2025 | |
| dc.description.abstract | Purpose – This research introduces novel algorithms (NDS-II-BMR and NDS-II-BWR) that combine the simplicity of best-mean-random (BMR) and best-worst-random (BWR) approaches with the opting mechanisms of NDS-II. Design/methodology/approach – This study expands on earlier comparison assessments by adding a broader range of algorithms, including MOPSO, NSGAII, PESA2 and WOA, to provide a more comprehensive evaluation approach for the proposed NDSII-BMR and NDSII-BWR algorithms. In addition to typical performance measurements, this study utilizes sophisticated statistical validation through the Wilcoxon signed-rank test to determine the statistical significance of performance differences across this varied range of multi-objective optimization approaches. Findings – The results demonstrate the effectiveness of NDSII-BMR and NDSII-BWR in optimizing costs and decreasing safety risks while minimizing time efficiency. These outcomes underscore the applicability of these models for managing complex construction projects in real-world scenarios. Originality/value – This study employs multi-objective functions to minimize the total project time and cost while reducing overall safety risks. The proposed model integrates the NDS-II framework with innovative strategies, best-mean-random (BMR) and best-worst-random (BWR). © 2025 Emerald Publishing Limited | |
| dc.identifier.doi | 10.1108/ec-04-2025-0339 | |
| dc.identifier.eissn | 1758-7077 | |
| dc.identifier.endpage | 34 | |
| dc.identifier.issn | 0264-4401 | |
| dc.identifier.issue | 1 | |
| dc.identifier.scopus | 2-s2.0-105022738679 | |
| dc.identifier.startpage | 1 | |
| dc.identifier.uri | https://rdlopen.rawdatalibrary.net/r/ebyu/11351 | |
| dc.identifier.volume | 43 | |
| dc.identifier.wos | WOS:001614715700001 | |
| dc.language.iso | en | |
| dc.publisher | Emerald Publishing | |
| dc.relation.ispartof | Engineering Computations (Swansea, Wales) | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.subject | BMR | |
| dc.subject | BWR | |
| dc.subject | Construction project management | |
| dc.subject | Cost | |
| dc.subject | NDS-II | |
| dc.subject | Optimization | |
| dc.subject | Safety risk | |
| dc.subject | Time | |
| dc.subject | Trade-off | |
| dc.subject | Multiobjective optimization | |
| dc.subject | Project management | |
| dc.subject | Risk management | |
| dc.subject | Safety engineering | |
| dc.subject | Best-bad-random | |
| dc.subject | Best-mean-random | |
| dc.subject | Construction projects | |
| dc.subject | Integrated risk management | |
| dc.subject | Optimisations | |
| dc.subject | Safety risks | |
| dc.subject | Trade off | |
| dc.subject | Costs | |
| dc.subject | Economic and social effects | |
| dc.title | Integrated risk management in construction project: utilizing NDSII-BMR and NDSII-BWR for time-cost-safety trade-offs | |
| dc.type | Article | |
| dspace.entity.type | Publication | |
| rdl.citation.scopus | 5 | |
| rdl.citation.wos | 4 | |
| rdl.source.index | SCOPUS | |
| rdl.source.index | WOS | |
| rdl.wos.index | Science Citation Index Expanded (SCI-EXPANDED) |
