Application of Grey Wolf Algorithm with Archive and Grid Mechanisms for Solving Construction Time–Cost–Quality Problems

Conference ObjectAçık Erişim

Özet

Multi-objective optimization problems are an important research area widely used to solve complex and competitive problems in various industries. In the construction sector, time, cost, and quality factors hold critical importance for the success of projects. Minimizing time, managing costs, and enhancing quality are essential elements for achieving success in many application areas. grey wolf optimization (GWO) is a natural search algorithm that has been effectively utilized in optimization problems in recent years. GWO offers an optimization approach that mimics the interaction between leader wolves, sub-leader wolves, and hunting wolves. The aim of this study is to enhance the performance of GWO algorithm in solving multi-objective construction time–cost–quality problems by integrating archive and grid mechanisms. The archive serves as a data structure to preserve diversity within the solution population and store better solutions. On the other hand, the grid mechanism aims to improve the search process by dividing the solution space. This study evaluates the performance of the GWO algorithm by addressing multi-objective construction time–cost–quality problems with 7 and 13 activities. The results obtained demonstrate that GWO algorithm outperforms genetic algorithm (NSGA-II). These findings highlight the impact and advantages of the GWO algorithm in solving multi-objective construction time–cost–quality optimization problems. © The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd. 2024.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/ebyu/11684Resmi atıflarda kullanılan kalıcı adres
DOI
https://doi.org/10.1007/978-981-97-4654-5_1Yayıncı resmi DOI adresi
Tam Kayıt
AlanDeğerDil
dc.contributor.authorYılmaz, Mehmet
dc.contributor.authorDede, Tayfun
dc.contributor.editorR., Venkata Rao
dc.contributor.editorJ., Taler
dc.date.accessioned2026-10-18T20:26:41.864531772Z
dc.date.available2026-10-18T20:26:41.864531772Z
dc.date.issued2024
dc.description.abstractMulti-objective optimization problems are an important research area widely used to solve complex and competitive problems in various industries. In the construction sector, time, cost, and quality factors hold critical importance for the success of projects. Minimizing time, managing costs, and enhancing quality are essential elements for achieving success in many application areas. grey wolf optimization (GWO) is a natural search algorithm that has been effectively utilized in optimization problems in recent years. GWO offers an optimization approach that mimics the interaction between leader wolves, sub-leader wolves, and hunting wolves. The aim of this study is to enhance the performance of GWO algorithm in solving multi-objective construction time–cost–quality problems by integrating archive and grid mechanisms. The archive serves as a data structure to preserve diversity within the solution population and store better solutions. On the other hand, the grid mechanism aims to improve the search process by dividing the solution space. This study evaluates the performance of the GWO algorithm by addressing multi-objective construction time–cost–quality problems with 7 and 13 activities. The results obtained demonstrate that GWO algorithm outperforms genetic algorithm (NSGA-II). These findings highlight the impact and advantages of the GWO algorithm in solving multi-objective construction time–cost–quality optimization problems. © The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd. 2024.
dc.identifier.doi10.1007/978-981-97-4654-5_1
dc.identifier.endpage9
dc.identifier.isbn978-981974653-8
dc.identifier.issn1876-1100
dc.identifier.scopus2-s2.0-85207583918
dc.identifier.startpage1
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/ebyu/11684
dc.identifier.volume1226 LNEE
dc.language.isoen
dc.publisherSpringer Science and Business Media Deutschland GmbH
dc.relation.ispartofLecture Notes in Electrical Engineering
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectGrey wolf optimization
dc.subjectMulti-objective optimization
dc.subjectTime–cost–quality trade off
dc.subjectComputational cost
dc.subjectCosts
dc.subjectMultiobjective optimization
dc.subjectOptimization algorithms
dc.subjectStructural optimization
dc.subjectConstruction time
dc.subjectGray wolf optimization
dc.subjectGray wolves
dc.subjectMulti-objectives optimization
dc.subjectOptimisations
dc.subjectQuality problems
dc.subjectTime cost
dc.subjectTrade off
dc.subjectGenetic algorithms
dc.titleApplication of Grey Wolf Algorithm with Archive and Grid Mechanisms for Solving Construction Time–Cost–Quality Problems
dc.typeConference Object
dspace.entity.typePublication
rdl.citation.scopus0
rdl.source.indexSCOPUS