Bu dergideki yayınlar

2 →
  • Conference ObjectYalnız künye2011
    Students as Future Performers: Intercultural Differences

    Kumpikaite, Vilmante; Aslan, Imrau; Chakherlouy, Farzam

    The aim of the study was to determinate students' intercultural differences in their viewpoint to human performance in organization according to group of factors using Blanchard and Thacker (2004) model. Corresponding survey Was provided in Lithuania before (Kumpikaite and Alas, 2009). The following survey was decided to expand and to look at differences in intercultural context. Lithuania, Turkey, and Iran were taken as purpose countries. It was selected because countries are from different cultures, religions and situated from the West (Lithuania in Europe) to the East (Turkey situated in Europe and Asia the Near East, and then Iran the Middle East) in Eurasia and because authors of this paper work in these countries and deal with described problems.

    RDL Kalıcı Kaydıİncele
  • Conference ObjectYalnız künye2011
    A Linear Programming Approach for Different Serial Machines Scheduling with Optimizing Batch Size in a Flow Oriented Synchronized Production

    Aslan, Imran

    Linear Programming (LP) models are widely used by companies to meet the demand for a variety of products efficiently. In a flow-shop, each product has to be processed by a number of machines in synchronized lines. This work presents a novel interactive linear programming approach for solving the multiproduct aggregate production planning problem with precise forecast demand, related operating costs, capacity and production-inventory model with constant/stock dependent demand. The proposed approach attempts to minimize total costs with reference to inventory levels, overtime, subcontracting and backordering levels, and machine and warehouse capacity. In this study, the problem of scheduling a set of parts with sequence-dependent setup times is considered. The production smoothing problem under presence of setup and processing times vary among the products. The master production-inventory problem of the firm was divided into two sub-problems which were concerned with determining the batch sizes and production sequences of products, respectively.

    RDL Kalıcı Kaydıİncele
Tam Kayıt
AlanDeğerDil
creativeworkseries.issn2010-4626
dc.date.accessioned2026-10-20T15:48:07.938372720Z
dc.date.available2026-10-20T15:48:07.938372720Z
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/ebyu/25774
dc.publisherINT ASSOC COMPUTER SCIENCE & INFORMATION TECHNOLOGY PRESS-IACSIT PRESS
dc.rightsinfo:eu-repo/semantics/openAccess
dc.titleINNOVATION, MANAGEMENT AND SERVICE, ICMS 2011
dspace.entity.typeJournal