A novel multi-objective optimization model for the time–cost–environmental impact trade-off in construction projects using a strength Pareto-based whale optimization algorithm

ArticleAçık Erişim

Özet

The construction industry, a key contributor to global economic development, significantly impacts environmental pollution through greenhouse gas emissions. While conventional construction project management prioritizes cost and time reduction, environmental considerations are increasingly critical. This study addresses the time-cost-environmental impact trade-off problem by introducing a strength Pareto-based whale optimization algorithm (SP2WOA). The algorithm enhances solution diversity and achieves well-distributed Pareto fronts by integrating strength Pareto operators with the whale optimization algorithm. Its effectiveness is demonstrated through three diverse construction projects. Compared to previous algorithms (non-dominated sorting genetic algorithm-II, opposition-based multi-objective differential evolution, golden ratio-based opposite teaching-learning-based optimization and enhanced multi-objective grasshopper optimization algorithm), SP2WOA achieves superior balances between time, cost and environmental impact, using 33-60% fewer function evaluations. Statistical analysis using Wilcoxon rank tests confirms SP2WOA's superiority in both hypervolume and spread metrics. The results demonstrate that SP2WOA offers a valuable tool for sustainable construction project management. © 2025 Informa UK Limited, trading as Taylor & Francis Group.

Anahtar Kelimeler

RDL Kalıcı Bağlantı (PID)
https://rdlopen.rawdatalibrary.net/r/ebyu/10428Resmi atıflarda kullanılan kalıcı adres
Tam Kayıt
AlanDeğerDil
dc.contributor.authorYılmaz, Mehmet
dc.contributor.authorDede, Tayfun
dc.date.accessioned2026-10-18T20:25:38.716846274Z
dc.date.available2026-10-18T20:25:38.716846274Z
dc.date.issued2026
dc.description.abstractThe construction industry, a key contributor to global economic development, significantly impacts environmental pollution through greenhouse gas emissions. While conventional construction project management prioritizes cost and time reduction, environmental considerations are increasingly critical. This study addresses the time-cost-environmental impact trade-off problem by introducing a strength Pareto-based whale optimization algorithm (SP2WOA). The algorithm enhances solution diversity and achieves well-distributed Pareto fronts by integrating strength Pareto operators with the whale optimization algorithm. Its effectiveness is demonstrated through three diverse construction projects. Compared to previous algorithms (non-dominated sorting genetic algorithm-II, opposition-based multi-objective differential evolution, golden ratio-based opposite teaching-learning-based optimization and enhanced multi-objective grasshopper optimization algorithm), SP2WOA achieves superior balances between time, cost and environmental impact, using 33-60% fewer function evaluations. Statistical analysis using Wilcoxon rank tests confirms SP2WOA's superiority in both hypervolume and spread metrics. The results demonstrate that SP2WOA offers a valuable tool for sustainable construction project management. © 2025 Informa UK Limited, trading as Taylor & Francis Group.
dc.identifier.doi10.1080/0305215x.2025.2502570
dc.identifier.eissn1029-0273
dc.identifier.endpage1151
dc.identifier.issn0305-215X
dc.identifier.issue4
dc.identifier.scopus2-s2.0-105005865611
dc.identifier.startpage1133
dc.identifier.urihttps://rdlopen.rawdatalibrary.net/r/ebyu/10428
dc.identifier.volume58
dc.identifier.wosWOS:001492278900001
dc.language.isoen
dc.publisherTaylor and Francis Ltd.
dc.relation.ispartofEngineering Optimization
dc.rightsinfo:eu-repo/semantics/openAccess
dc.subjectmulti-objective optimization
dc.subjectStrength Pareto
dc.subjectsustainable management
dc.subjecttime–cost–environmental impact trade-off
dc.subjectConstruction industry
dc.subjectEffluents
dc.subjectParticulate emissions
dc.subjectConstruction project management
dc.subjectConstruction projects
dc.subjectMulti-objective optimization models
dc.subjectMulti-objectives optimization
dc.subjectOptimization algorithms
dc.subjectTime cost
dc.subjectTrade off
dc.subjectProject management
dc.titleA novel multi-objective optimization model for the time–cost–environmental impact trade-off in construction projects using a strength Pareto-based whale optimization algorithm
dc.typeArticle
dspace.entity.typePublication
rdl.citation.scopus3
rdl.citation.wos3
rdl.source.indexSCOPUS
rdl.source.indexWOS
rdl.wos.indexScience Citation Index Expanded (SCI-EXPANDED)